Description
Experience a guided tour of the Ruppoldingen hydropower plant, which harnesses water to generate renewable, nearly CO2-free electricity. The plant features two large turbines with a combined capacity of 21 MW and produces around 115 GWh annually. The tour provides insights into environmental protection measures and landscape restoration efforts along the Aare river, making it an educational experience for individuals and families.
Highlights
Guided tour of a major Swiss hydropower plant; insights into renewable energy production; environmental protection measures; large turbines and scenic landscape.
General Information
Held at Kraftwerk Ruppoldingen, Aarburgerstrasse 264, Boningen, Switzerland. The event is suitable for individuals and families, with a maximum of 5 tickets per reservation. The tour requires at least 8 participants and is accessible by foot from Rothrist train station. The event may be canceled if minimum attendance is not met.
Location
Loading map...
How to get there
Event Calendar
November 2026
Event Media
More events in Rothrist
Ready to Host an Event?
Create, manage, and promote your event in minutes.








